Scotsman MC 45 User Manual

Browse online or download User Manual for Ice cube makers Scotsman MC 45. MC-first half

  • Download
  • Add to my manuals
  • Print
  • Page
    / 136
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 0
TECHNICAL SERVICE TRAINING
TECHNICAL SERVICE TRAINING
Welcome to another
Welcome to another
Scotsman
Scotsman
technical
technical
service
service
presentation. This one will cover the MC
presentation. This one will cover the MC
Series Ice Cube Machines models
Series Ice Cube Machines models
MC 15, MC 45
MC 15, MC 45
and
and
MC 1210.
MC 1210.
MC SERIES
MC SERIES
CUBERS
CUBERS
Page view 0
1 2 3 4 5 6 ... 135 136

Summary of Contents

Page 1 - MC SERIES

TECHNICAL SERVICE TRAININGTECHNICAL SERVICE TRAININGWelcome to anotherWelcome to another Scotsman Scotsman technical technical service service present

Page 2 - MC 15 + B 350

MC SERIESMC SERIESTOPICSTOPICSOn the next slides are shown the following steps by stepsprocedures:•• UNPACKING UNPACKING•• INSTALLATION INSTALLATION••

Page 3 - MC 45 + B 550

TERMINALBOARDTERMINALBOARDCONDENSERSENSOR SOCKETCONDENSERSENSOR SOCKETOPTICAL ICE LEVELCONTROLSENSORSOCKETOPTICAL ICE LEVELCONTROLSENSORSOCKETMICROPRO

Page 4 - MC 1210 + B 120

SWITCH 9OPERATING TIMEOF WATER PUMPDURING HARVESTOFF = 15”ON = 30”SWITCH 9OPERATING TIMEOF WATER PUMPDURING HARVESTOFF = 15”ON = 30”SWITCH 7 AND 8EXTE

Page 5

OPERATING PRINCIPLES - PC BOARDOPERATING PRINCIPLES - PC BOARDTime TTime T11From startup offreezingcycle till theblinking of0°C RedLEDMC SERIESMC SERI

Page 6

OPERATING PRINCIPLES - PC BOARDOPERATING PRINCIPLES - PC BOARDTime TTime T22Fromblinking ofRed LEDtill the lightON steadyof -15°CRed LEDMC SERIESMC SE

Page 7

OPERATING PRINCIPLES - PC BOARDOPERATING PRINCIPLES - PC BOARDTime TTime TaaAdded time controlled bythe PC Board accordingto the setting of the DIPSWI

Page 8

OPERATING PRINCIPLES - PC BOARDOPERATING PRINCIPLES - PC BOARDTime TTime TssHarvest Time TS iscontrolled by the PCBoard and it is inverselyproportiona

Page 9

START UP AND OPERATIONAL CHECKSSTART UP AND OPERATIONAL CHECKSIt’s possible to extend the length of the harvest cycle (Te) bymeans of the DIP SWITCH 7

Page 10

OPERATING PRINCIPLES - PC BOARDOPERATING PRINCIPLES - PC BOARDTime TTime TaaTime TTime T11+T+T22TimeTimeTTssFreezing = TFreezing = T11 + T + T22 + +

Page 11 - UNPACKING

OPERATING PRINCIPLES - ALARMOPERATING PRINCIPLES - ALARMWhenever thecondensing temperaturerise up to 70ºC (aircooled version) or 60ºC(water cooled ver

Page 12

OPERATING PRINCIPLES - ALARMOPERATING PRINCIPLES - ALARMIn case the evaporatingtemperature remainshigher then 0ºC after 15minutes from thebeginning of

Page 13

UNPACKINGUNPACKINGUNPACKINGMC SERIESMC SERIES

Page 14

OPERATING PRINCIPLES - ALARMOPERATING PRINCIPLES - ALARMIn case both theRed and YellowLED are lightON steady thecondenser sensor isout of order andnee

Page 15

OPERATING PRINCIPLES - ALARMOPERATING PRINCIPLES - ALARMIn case both theRed and YellowLED areblinking theevaporator sensoris out of order andneed to b

Page 16

OPERATING PRINCIPLES - BIN FULLOPERATING PRINCIPLES - BIN FULLAs soon as theice cubes are inbetween thetransmitter andreceiver sensorof the OpticalIce

Page 17

OPERATING PRINCIPLES - BIN FULLOPERATING PRINCIPLES - BIN FULL….immediatelythe Bin FullYellow LEDstarts to blinkand after…..FREEZING CYCLEBIN FULLPOWE

Page 18

OPERATING PRINCIPLES - BIN FULLOPERATING PRINCIPLES - BIN FULL….one minutethe PC Boardswitch OFF theentire machinewith the lightON of BINFULL YellowLE

Page 19 - INSTALLATION

OPERATING PRINCIPLES - BIN FULLOPERATING PRINCIPLES - BIN FULLWhen ice isscooped outfrom thestorage bin….MC SERIESMC SERIES

Page 20

OPERATING PRINCIPLES - BIN FULLOPERATING PRINCIPLES - BIN FULL…. after six-sevenseconds the machinerestart in theoperation from thebeginning of thefre

Page 21

OPERATING PRINCIPLES - BIN FULLOPERATING PRINCIPLES - BIN FULL….….or from theharvest cycle whenthe evaporatingtemperature isbelow 0ºC in orderto avoid

Page 22

OPERATING PRINCIPLES - POWER OFFOPERATING PRINCIPLES - POWER OFFIn case of black out in power the machine re-starts (when poweris back) through the 5

Page 23

OPERATING PRINCIPLES - POWER OFFOPERATING PRINCIPLES - POWER OFFIn case of black out in power the machine re-starts (when poweris back) through the 5

Page 24

MC SERIESMC SERIESUNPACKINGUNPACKINGThe machines are suppliedin a carton box secured bytwo plastic strips to awooden base. Check firstthe outside cond

Page 25

MC SERIESMC SERIESThe components of the refrigerantsystem of the MC series Models arecomposed by:••COMPRESSORCOMPRESSORLOCATION OF REFRIGERANT COMPONE

Page 26

MC SERIESMC SERIES• COMPRESSOR••CONDENSERCONDENSERLOCATION OF REFRIGERANT COMPONENTSLOCATION OF REFRIGERANT COMPONENTSCOMPONENTS - REFRIGERANT SYSTEMC

Page 27

MC SERIESMC SERIESLOCATION OF REFRIGERANT COMPONENTSLOCATION OF REFRIGERANT COMPONENTSCOMPONENTS - REFRIGERANT SYSTEMCOMPONENTS - REFRIGERANT SYSTEM•

Page 28

MC SERIESMC SERIES• COMPRESSOR• CONDENSER• EVAPORATOR••SUCTION LINE ANDSUCTION LINE ANDCAPILLARY TUBECAPILLARY TUBELOCATION OF REFRIGERANT COMPONENTSL

Page 29

MC SERIESMC SERIES• COMPRESSOR• CONDENSER• EVAPORATOR• SUCTION LINE ANDCAPILLARY TUBE••DRIERDRIERLOCATION OF REFRIGERANT COMPONENTSLOCATION OF REFRIGE

Page 30

MC SERIESMC SERIES• COMPRESSOR• CONDENSER• EVAPORATOR• SUCTION LINE AND CAPILLARYTUBE• DRIER••HOT GAS VALVEHOT GAS VALVELOCATION OF REFRIGERANT COMPON

Page 31

MC SERIESMC SERIESCOMPONENTS - WATER SYSTEMCOMPONENTS - WATER SYSTEMThe components of the water systemof the MC Series Models arecomposed by:•• WATER

Page 32

MC SERIESMC SERIES• WATER INLET VALVE•• WATER SUMPWATER SUMPCOMPONENTS - WATER SYSTEMCOMPONENTS - WATER SYSTEM

Page 33

MC SERIESMC SERIES• WATER INLET VALVE• WATER SUMP•• WATER PUMPWATER PUMPCOMPONENTS - WATER SYSTEMCOMPONENTS - WATER SYSTEM

Page 34 - MC 15-45

MC SERIESMC SERIES• WATER INLETVALVE• WATER SUMP• WATER PUMP•• SPRAY BARSPRAY BARCOMPONENTS - WATER SYSTEMCOMPONENTS - WATER SYSTEM

Page 35

MC SERIESMC SERIESUNPACKINGUNPACKINGVisuallyinspect theexterior of themachine thenremove thetwo sidepanels……………..and thevertical icechute…..

Page 36

MC SERIESMC SERIES• WATER INLETVALVE• WATER SUMP• WATER PUMP• SPRAY BAR•• OVERFLOWOVERFLOWCOMPONENTS - WATER SYSTEMCOMPONENTS - WATER SYSTEM

Page 37 - COLD AIR

MC SERIESMC SERIES• WATER INLETVALVE• WATER SUMP• WATER PUMP• SPRAY BAR• OVERFLOW•• WATER DRAINWATER DRAINVALVEVALVECOMPONENTS - WATER SYSTEMCOMPONEN

Page 38 - MC 15 + MC 45

MC SERIESMC SERIESCOMPONENTS - ELECTRONIC CONTROLSCOMPONENTS - ELECTRONIC CONTROLSThe components ofthe ElectronicSystem of the MCSeries Models arecomp

Page 39

MC SERIESMC SERIESCOMPONENTS - ELECTRONIC CONTROLSCOMPONENTS - ELECTRONIC CONTROLS• PC BOARD••EVAPORATOREVAPORATORSENSORSENSOR

Page 40

MC SERIESMC SERIESCOMPONENTS - ELECTRONIC CONTROLSCOMPONENTS - ELECTRONIC CONTROLS• PC BOARD• EVAPORATORSENSOR••CONDENSERCONDENSERSENSORSENSOR

Page 41

MC SERIESMC SERIESCOMPONENTS - ELECTRONIC CONTROLSCOMPONENTS - ELECTRONIC CONTROLS• PC BOARD• EVAPORATORSENSOR• CONDENSERSENSOR••OPTICAL ICEOPTICAL IC

Page 42

END FIRSTEND FIRSTHALFHALFMC SERIESMC SERIES

Page 43

MC SERIESMC SERIESUNPACKINGUNPACKING…..unscrewthe unit framefrom thewoodenbase….

Page 44

MC SERIESMC SERIESUNPACKINGUNPACKING…..then removefrom the inside ofthe machine all thepolystyreneprotection as wellas the….…..the Optical IceLevel Co

Page 45 - STACKING INSTALLATION

MC SERIESMC SERIESUNPACKINGUNPACKINGThe Modular Cubermachines require for theinstallation the use of acompanion storage binto store the iceproduced.St

Page 46

MC SERIESMC SERIESUNPACKINGUNPACKINGUnpack thestorage bin andvisually inspectthe exterior thenremove fromthe inside thecarton boxcontaining theplastic

Page 47

MC SERIESMC SERIESUNPACKINGUNPACKINGUnloose the two screws holdingthe drain fitting protection andremove it

Page 48

INSTALLATIONINSTALLATIONINSTALLATIONMC SERIESMC SERIES

Page 49

MC 15 + B 350MC 15 + B 350

Page 50

MC SERIESMC SERIESInstall the fourlegs sockets onthe bottom baseof the storage binas well as themetal legs.INSTALLATIONINSTALLATION

Page 51

MC SERIESMC SERIESPlace the storage binin its definitivelocation then installon top of the same theice machine.INSTALLATIONINSTALLATION

Page 52

MC SERIESMC SERIESPlacebetweenthemachineand thestorage binthe metalbracket ofthe IceLevelControl.INSTALLATIONINSTALLATION

Page 53

MC SERIESMC SERIESSecure themachine tothe storagebin by meansof the twoscrewssupplied.INSTALLATIONINSTALLATION

Page 54

MC SERIESMC SERIESInsert thetwo plasticclips into thetwo squareholes of theS.S. bracketthen ….INSTALLATIONINSTALLATION

Page 55

MC SERIESMC SERIES……cut the plastic stripsecuring the Optical IceLevel Control to the suctionline of the machine.INSTALLATIONINSTALLATION

Page 56

MC SERIESMC SERIESCut the rubber pluglocated on the right side ofthe ice chute rectangularopening then….INSTALLATIONINSTALLATION

Page 57

MC SERIESMC SERIES…..drive downinto the storagebin the OpticalIce Level Controland secure it withthe two screwssupplied with themachine.INSTALLATIONIN

Page 58

MC SERIESMC SERIESInstall on theupper front sideof the Ice Chuterectangularopening the IceCubes plasticdeflectorsupplied withthe storage binpay attent

Page 59

MC SERIESMC SERIES….. properlyhook it onthe frontedge.INSTALLATIONINSTALLATION

Page 60

MC 45 + B 550MC 45 + B 550

Page 61

MC SERIESMC SERIESInstall againthe verticalice chutewith itscover…..INSTALLATIONINSTALLATION

Page 62

MC SERIESMC SERIES….. payingattention tohook it on theupper side ofthe evaporatoropening .INSTALLATIONINSTALLATION

Page 63

MC SERIESMC SERIESINSTALLATIONINSTALLATIONCheck the data plateof the machinelocated on the rearpanel for correctvoltage as well as forthe proper wirin

Page 64

MC SERIESMC SERIESINSTALLATIONINSTALLATIONCheck for the correct water and ambient conditions that should be:• Min. ambient temperature 10ºC (50F)• Max

Page 65

MC 15-45MC 15-45INSTALLATIONINSTALLATIONAdequatespace must leftbe for properwater andelectricalconnections onthe rear side ofthe machine. Aminimumclea

Page 66

COLD AIRCOLD AIRHOT AIRHOT AIRINSTALLATION - AIR CIRCULATIONINSTALLATION - AIR CIRCULATIONCONDENSERFAN MOTORCOMPRESSORICE CHUTEOPENINGMC 15-45MC 15-45

Page 67

MC 1210MC 1210INSTALLATIONINSTALLATIONAdequate spacemust be left forproper water andelectricalconnections onthe rear side ofthe machine aswell as for

Page 68

COLD AIRCOLD AIRHOT AIRHOT AIRINSTALLATION - AIR CIRCULATIONINSTALLATION - AIR CIRCULATIONCOMPRESSORCOMPRESSORFAN MOTORCONDENSERICE CHUTEOPENINGICE CH

Page 69

MC 15 + MC 45MC 15 + MC 45STACKING INSTALLATIONSTACKING INSTALLATION

Page 70

MC 15 + MC 45MC 15 + MC 45STACKING INSTALLATIONSTACKING INSTALLATIONFor the Stakinginstallation aproper kit - KSC11 - is required.It consists of:• Ice

Page 71

MC 1210 + B 120MC 1210 + B 120

Page 72

MC 15 + MC 45MC 15 + MC 45STACKING INSTALLATIONSTACKING INSTALLATION• Ice connecting chute/s• Interface PC Boardsmade by SYEN…….. and by Pro.El.Ind.

Page 73

MC 15 + MC 45MC 15 + MC 45STACKING INSTALLATIONSTACKING INSTALLATION• Ice connecting chute/s• Interface PC Board• Gasket

Page 74

MC 15 + MC 45MC 15 + MC 45STACKING INSTALLATIONSTACKING INSTALLATION• Ice connecting chute/s• Interface PC Board• Gasket• Extension optical cable

Page 75

MC 15 + MC 45MC 15 + MC 45STACKING INSTALLATIONSTACKING INSTALLATIONThe Ice connectingchute/s must be installedthrough the bottomrectangular opening o

Page 76

MC 15 + MC 45MC 15 + MC 45STACKING INSTALLATIONSTACKING INSTALLATIONThe Interface PCBoard must beinstalled in the bottommachine. The OpticalIce Level

Page 77

STACKING INSTALLATIONSTACKING INSTALLATIONICE LEVELCONTROLICE LEVELCONTROLMAIN PCBOARDMAIN PCBOARDINTERFACEPC BOARDINTERFACEPC BOARDMAIN PCBOARDMAIN P

Page 78

MC 15 + MC 45MC 15 + MC 45STACKING INSTALLATIONSTACKING INSTALLATIONATTENTION!!!It is IMPERATIVE that all the three PC Boards (Ice Machines ones + the

Page 79

MC 15 + MC 45MC 15 + MC 45STACKING INSTALLATIONSTACKING INSTALLATIONThe gaskets must beinstalled in the spaceremaining between thebottom base of theup

Page 80

MC 15 + MC 45MC 15 + MC 45STACKING INSTALLATIONSTACKING INSTALLATIONThe Extension cable must be usedonly when a current Electronicmachine is installed

Page 81

MC SERIESMC SERIESINSTALLATIONINSTALLATIONLevel the unit on bothdirections front torear and right to leftside using theadjustable legs.

Page 82

MC SERIESMC SERIESTOPICSTOPICSOn the next slides are shown the following steps by stepsprocedures:•• UNPACKINGUNPACKING•• INSTALLATION INSTALLATION••

Page 83

MC SERIESMC SERIESINSTALLATION - ELECTRICALINSTALLATION - ELECTRICALInstall, on the cable supplywith the machine, anadaguate electrical plugaccording

Page 84

MC SERIESMC SERIESINSTALLATION - WATER ININSTALLATION - WATER INConnect the water inlet 3/4”male threat of the water inletsolenoid valve to the waters

Page 85

MC SERIESMC SERIESINSTALLATION - WATER DRAININSTALLATION - WATER DRAINConnect the 20 mm O.D. fitting (2on model MC 45) of the waterdrain with the flex

Page 86

MC SERIESMC SERIESTYPICAL INSTALLATIONTYPICAL INSTALLATIONPOWERWATER INLETWATER DRAINHAND DISCONNECTSWITCHWATERFILTERWATERVALVEWATER DRAINAIR COOLEDAI

Page 87

MC SERIESMC SERIESINSTALLATION - WATER ININSTALLATION - WATER INOn the water cooledversion there is aseparate 3/4” malethread water inlet fittingconne

Page 88

MC SERIESMC SERIESINSTALLATION - WATER OUTINSTALLATION - WATER OUT…..a second separate drainhose must be connected tothe outlet 3/4” male fittinglocat

Page 89

MC SERIESMC SERIESTYPICAL INSTALLATIONTYPICAL INSTALLATIONPOWERWATER INLETWATER DRAINHAND DISCONNECTSWITCHWATERFILTERWATERVALVEWATER DRAINWATER COOLED

Page 90

START UP ANDOPERATIONALCHECKSSTART UP ANDSTART UP ANDOPERATIONALOPERATIONALCHECKSCHECKSMC SERIESMC SERIES

Page 91

• Open the water tap/valve. • Switch ON the power on theelectrical supply line.START UP AND OPERATIONAL CHECKSSTART UP AND OPERATIONAL CHECKSMC SERIES

Page 92

START UP AND OPERATIONAL CHECKSSTART UP AND OPERATIONAL CHECKSMC SERIESMC SERIESThe Ice Machine will start up automatically through the 5 minutes“Wate

Page 93

MC SERIESMC SERIESTOPICSTOPICSOn the next slides are shown the following steps by stepsprocedures:•• UNPACKING UNPACKING•• INSTALLATIONINSTALLATION••

Page 94

The components energizedduring the first 5’ are:• PC BoardPC BoardSTART UP AND OPERATIONAL CHECKSSTART UP AND OPERATIONAL CHECKSMC SERIESMC SERIES

Page 95

START UP AND OPERATIONAL CHECKSSTART UP AND OPERATIONAL CHECKSThe components energized duringthe first 5’ are:• PC Board• Water Inlet Solenoid ValveWa

Page 96

START UP AND OPERATIONAL CHECKSSTART UP AND OPERATIONAL CHECKSThe components energizedduring the first 5’ are:•PC Board• Water Inlet SolenoidValve••Wa

Page 97

The components energizedduring the first 5’ are:• PC Board• Water Inlet Solenoid Valve• Water Drain/PurgeSolenoid Valve• Hot Gas SolenoidHot Gas Solen

Page 98

During the first 5’ the watergoes through the Water InletValve then….….flows into the small orificeof the “Flow Control” locatedon the outlet port of

Page 99

Following the copper inlet tubethe incoming water arrive on theupper side of the evaporator…... where it flows onto the plasticevaporator platen dri

Page 100

Dribbled water iscollected down intothe water sumpwhere is locatedthe overflow standpipe that assuresthe proper waterlevel and quantityfor the nextfre

Page 101

After the first 5’ of water fillingphase the machine start upautomatically on freezing cyclewith the following electricalcomponents in operation:• Com

Page 102

• Compressor• Water PumpSTART UP AND OPERATIONAL CHECKSSTART UP AND OPERATIONAL CHECKSMC SERIESMC SERIES

Page 103

• Compressor• Water Pump• Fan Motor (on air cooledversion only)START UP AND OPERATIONAL CHECKSSTART UP AND OPERATIONAL CHECKSMC SERIESMC SERIES

Page 104

MC SERIESMC SERIESTOPICSTOPICSOn the next slides are shown the following steps by stepsprocedures:•• UNPACKING UNPACKING•• INSTALLATION INSTALLATION••

Page 105

START UP AND OPERATIONAL CHECKSSTART UP AND OPERATIONAL CHECKS• Compressor• Water Pump• Fan Motor (on air cooledversion only)•ContactorMC SERIESMC SE

Page 106

The operation of thefan motor is controlledby a condensertemperature sensorlocated within the finsof condenser thattransmit a signal to thePC Board

Page 107

On PC Board the LED energized are:• PowerSTART UP AND OPERATIONAL CHECKSSTART UP AND OPERATIONAL CHECKSFREEZING CYCLEBIN FULLPOWERTOO HI EVAP TEMPTOO

Page 108

On PC Board the LED energized are:• Power• FreezingSTART UP AND OPERATIONAL CHECKSSTART UP AND OPERATIONAL CHECKSFREEZING CYCLEBIN FULLPOWERTOO HI EVA

Page 109

Water iscirculating bythe water pumpinto the invertedtin plated coppermolds of theevaporator….START UP AND OPERATIONAL CHECKSSTART UP AND OPERATIONAL

Page 110

START UP AND OPERATIONAL CHECKSSTART UP AND OPERATIONAL CHECKS….while therefrigerant isflowing intothe serpentinewelded on theupper side ofthe tin pla

Page 111

Afterapproximately 5minutes after thestart up of thefreezing cycle, thetemperature of theevaporatorserpentine dropsdown to 0ºC….START UP AND OPERATION

Page 112

….with the blinking of the small RED LED located in the center ofPC Board.START UP AND OPERATIONAL CHECKSSTART UP AND OPERATIONAL CHECKSMC SERIESMC SE

Page 113

Approximately 5minutes thetemperature of theevaporatorserpentine dropsdown to - 15ºC….START UP AND OPERATIONAL CHECKSSTART UP AND OPERATIONAL CHECKS-1

Page 114

….with the light ON steady of the small RED LED located in thecenter of PC Board.START UP AND OPERATIONAL CHECKSSTART UP AND OPERATIONAL CHECKSMC SERI

Page 115

MC SERIESMC SERIESTOPICSTOPICSOn the next slides are shown the following steps by stepsprocedures:•• UNPACKING UNPACKING•• INSTALLATION INSTALLATION••

Page 116

The machine remains inthe freezing cycle till itscompletion for anadditional timeaccording to the set up ofthe first four DIPSWITCH of the PCBoard.STA

Page 117

Once completed the freezing cyclethe machine enters into thedefrost or harvest cycle with thefollowing electrical componentsin operation:••CompressorC

Page 118

• Compressor••Water Inlet Solenoid valveWater Inlet Solenoid valveSTART UP AND OPERATIONAL CHECKSSTART UP AND OPERATIONAL CHECKSMC SERIESMC SERIES

Page 119

• Compressor• Water Inlet Solenoidvalve••Water Drain/PurgeWater Drain/PurgeSolenoid ValveSolenoid ValveSTART UP AND OPERATIONAL CHECKSSTART UP AND OPE

Page 120

• Compressor• Water Inlet Solenoid valve• Water Drain/Purge SolenoidValve••Hot Gas ValveHot Gas ValveSTART UP AND OPERATIONAL CHECKSSTART UP AND OPERA

Page 121

According to the setting ofthe DIP SWITCH no 9 theWater Pump can remain inoperation to discharge thewater not used on theprevious freezing cycleduring

Page 122

….15” of theharvest cycle whenthe DIP SWITCH isin OFF position or30” when in ONposition.START UP AND OPERATIONAL CHECKSSTART UP AND OPERATIONAL CHECKS

Page 123

START UP AND OPERATIONAL CHECKSSTART UP AND OPERATIONAL CHECKSThe length of thedefrost or harvestcycle iscontrolled by thePC Boardaccording to thesett

Page 124

START UP AND OPERATIONAL CHECKSSTART UP AND OPERATIONAL CHECKS…..the time that themachine takes to dropthe evaporatingtemperature from 0ºCto -15ºC (ti

Page 125

START UP AND OPERATIONAL CHECKSSTART UP AND OPERATIONAL CHECKSIt’s possible to extend the length of the defrost cycle by means ofthe DIP SWITCH 7 and

Page 126

MC SERIESMC SERIESTOPICSTOPICSOn the next slides are shown the following steps by stepsprocedures:•• UNPACKING UNPACKING•• INSTALLATION INSTALLATION••

Page 127

During the defrostor harvest cyclethe combinedaction ofrefrigerant in HotGas state andincoming Waterare going topartially melt theice cubes incontact

Page 128

Holding anhand full ofice cubesbetween theI/R OpticalIce LevelSensor duringthe defrostcycle it ispossible totest itsoperation.START UP AND OPERATIONAL

Page 129

The Bin Full YELLOW LED starts to blink.START UP AND OPERATIONAL CHECKSSTART UP AND OPERATIONAL CHECKSFREEZING CYCLEBIN FULLPOWERTOO HI EVAP TEMPTOO H

Page 130

After 1 minute of continuous interruption of the infrared beam betweentransmitter and received (Bin Full YELLOW LED always blinking) themachine switch

Page 131

OPERATINGPRINCIPLESandCOMPONENTSOPERATINGOPERATINGPRINCIPLESPRINCIPLESandandCOMPONENTSCOMPONENTSMC SERIESMC SERIES

Page 132

OPERATING PRINCIPLES - FREEZEOPERATING PRINCIPLES - FREEZECompressorCompressorEvaporatorEvaporatorAir cooledAir cooledcondensercondenserHotHotgasgasva

Page 133

OPERATING PRINCIPLES - HARVESTOPERATING PRINCIPLES - HARVESTCompressorCompressorEvaporatorEvaporatorAir cooledAir cooledcondensercondenserHotHotgasgas

Page 134

MC SERIESMC SERIESWATER SYSTEM - FREEZEWATER SYSTEM - FREEZE

Page 135

MC SERIESMC SERIESWATER SYSTEM - HARVESTWATER SYSTEM - HARVESTFIRST PORTION 30”FIRST PORTION 30”

Page 136 - END FIRST

MC SERIESMC SERIESWATER SYSTEM - HARVESTWATER SYSTEM - HARVESTSECOND PORTIONSECOND PORTION

Comments to this Manuals

No comments